000 01179nam a2200301 a 4500
008 110713s2009 flu||||| |||| 00| 0 eng c
020 _a9781420090161 (vol.1)
020 _a9781420090246 (vol.2)
020 _a9781420090260 (vol.3)
020 _a9781420090284 (vol.4)
020 _a9781420090307 (vol.5)
020 _a9781420090321 (vol.6)
040 _aPSP
_cPSP
050 _aTS157.4
_bH668 2009
100 _aHirano, Hiroyuki
_94595
245 1 0 _aJIT implementation manual :
_bthe complete guide to just-in-time manufacturing /
_cHiroyuki Hirano.
250 _a2nd ed.
260 _aBoca Raton, Florida :
_bCRC Press,
_c2009.
300 _a6 v. :
_bill. ;
_c28cm.
336 _2rdacontent
337 _2rdamedia
338 _2rdacarrier
504 _aIncludes index
505 0 _av. 1. The just-in-time production system -- v. 2. Waste and the 5S's -- v. 3. Flow manufacturing-multi-process operations and kanban -- v. 4. Leveling-changeover and quality assurance -- v. 5. Standardized operations-jidoka and maintenance/safety -- v. 6. JIT implementation forms and charts.
650 0 _aJust in time systems
_94596
942 _2lcc
_cBKC
959 _aRS
_bRS
999 _c13618
_d13618